Central Contra Costa Sanitary District
CCCSD Home Page

Decrease Text Size Increase Text Size Subscribe to this page

Sewer System Management Plan

The District has prepared a Sewer System Management Plan (SSMP) in accordance with the requirements of the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

The goals of the SSMP are to:

  • Responsibly manage, operate, and maintain all parts of the wastewater collection system and adhere to the components of the SSMP
  • Provide adequate capacity to convey design peak flows
  • Minimize the frequency of sewer system overflows
  • Mitigate the impact of sewer system overflows
  • Develop annual strategic goals and measure progress towards those goals

Sewer System Management Plan - November 2017 /common/images/icon-pdf.gif 

Sanitary Sewer Overflow & Backup Response Plan /common/images/icon-pdf.gif 

Pumping Stations Emergency Response Plan /common/images/icon-pdf.gif 

Sewer System Management Plan Position Paper /common/images/icon-pdf.gif 

Central Contra Costa Sanitary District - Code of Laws 

Standard Specifications /common/images/icon-pdf.gif